Case studies
Contingency Logistics
Client: DOD
Rapid Construction of Temporary Camp
CRC designed a full-service camp in Obo, CAR within a 60-day deployment and construction timeline that included addressing requirements for disassembly and remediation within one weeks’ time, per customer requirements. In response to last minute changes, CRC was required to have the camp mobilized, ready to occupy, and operational within 14 days of Notice to Proceed from the customer.